Problems on Time and Work
1. If'A' completes a piece of work in 3 days, which 'B'
completes it in 5 days and 'C' takes 10 days to
complete the same work. How long will they take to
complete the work, if they work together?
​

Respuesta :

Unknownforyou1
Unknownforyou1 Unknownforyou1
  • 20-09-2020

Answer:

Bro the work is already completed..

Answer Link

Otras preguntas

Write a metaphor and a simile about how u feel . Example: I feel as happy as a puppy rolling in the grass. I feel as happy as a kitten playing with a ball of th
Solve by substitution 13x-4y=38 ×-6y= -54
Fern fronds grow from underground stems called sori. True or false.
justin is redoing his bathroom floor with tiles measuring 6 in. by 13 in. the floor has an area of 8,500 in2. what is the least number of tiles he will need?
Find the unit rate. Nuts cost $10.75 for 3 pounds.
where do most people in egypt live today?
what is the scientific notation of 130400000)
Fern fronds grow from underground stems called sori. True or false.
American involvement in the Korean War took place in which decade? A. 1970s B. 1950s C. 1920s D. 1960s
During the rock cycle, subduction pushes rock into the mantle. The rock melts into magma, which will eventually cool into _____.