coDecesn4ems8
coDecesn4ems8 coDecesn4ems8
  • 18-05-2016
  • Computers and Technology
contestada

explain why the intangibility of software systems poses special problems for software project management.

Respuesta :

Hagrid
Hagrid Hagrid
  • 24-05-2016
Unlike other projects like hardware, mechanical works which is tangible it is very easy to identify the progress of the product. But since the product here is software, it is very hard to determine at what phase or progress you are on now. Thus it needs a documentation from someone who are very knowledgeable to be able to know your progress,
Answer Link

Otras preguntas

Animals who can control the direction they move in all have a. a home in the ocean. b. development as a deuterostome. c. muscles. d. radial symmetry
Solve for x: log6x-log2=1
Many economists believe that since resources are scarce and since human desires cannot all be -------, a method of ------- is needed. (A) indulged . . apport
The density of cork is 0.24 g/cm3. What is the volume of a 240-gram piece of cork?
find -x when x = 80 /49 what is the answer and explain please
Is 9/12. Bigger than 3/4?
Marita orders 12 yards of material to make banners.If she needs 2 foot of fabric for each banner how many banners can she make?
Under certain conditions, sound travels at approximately 1080 feet per second. If Marsala yells down a canyon and hears her echo 1.7 seconds later, approximatel
State two numbers such that the lesser number is 25% less than the greater number.
What happens to the volume of a cone when the height is doubled ?