contestada

"when making contingency estimates, the contractor should"

Respuesta :

W0lf93
W0lf93 W0lf93
  • 03-02-2018
The contractor should take into account the time of year, the estimated completion time for the project, the typical weather of the region, and potential for shortages in supply. The time of the year determines the typical weather. Hot weather can slow down the project. Extreme cold or rainy weather would do the same.
Answer Link

Otras preguntas

4) Pas sock drawer contains only black socks and white socks. There are 28 pairs of socks altogether. The ratio of bsocks towhite socks is 2 to 5. How many pair
How does society play a role in creating gender roles
X2+4x+3=0 what is the quadratic
Which president, the oldest candidate ever elected, pushed for large tax cuts for the wealthy in an attempt to stimulate economic growth for all? A. Ronald
Start-ups are usually
Which phrase best completes the sentence? I thought rowing the boat across the pond would be_____________, but it was really hard to do. A. a sail through B. a
What is the means-to-MAD ratio of the two data sets, expressed as a decimal? Data set Mean Mean absolute deviation (MAD) 1 10.7 2.4 2 13.7 2.5 2.What is the mea
which law /legislation protects the individual against human rights violation
which group began to rebel against their English king when laws were enacted to force Conformity to the Church of England
These parts of cells provide energy for the cell.