What conditions must exist for separate contracts to be viable?

Respuesta :

W0lf93
W0lf93 W0lf93
  • 30-01-2018
The owner must be an in house CM or construction engineer to administer the contracts. CM is established as an independent contractor. The CM is responsible to the owner to complete the project by the established substantial completion date and within the agreed budget. The CM must compensate the owner when the construction does not satisfy the established standards of performance for a project.
Answer Link

Otras preguntas

3. Simplify the followinga)[(116)3 x 114]x 1212​
HELP ME PLS! Determine the presssure at the bottom of a container filled with gasoline, if the height of the container is 200 cm long. The gasoline's density is
Balance the following equations: i) KClO3 KCl + O2 ii) HNO3 + NaHCO3 NaNO3 + H2O + CO2 iii) Na + H2O NaOH + H2
solve inequality 4+2(a+5)<-2(-a-4)
Which statement below TRUE about the properties of water.A. Universal solventB. Water density at 40 CC. Has specific heat capacityD. Has surface tension​
What infection is caused by the bacterium Staphylococcus aureus?​
iteams in house made of thermosetting plastics?
PLEASE ASAP! I SENT A PHOTO CHECK AND TELL!
5. Say the following are deductions on a typical income, i. Pension deductions are 5% ii. Emploment Insurance deductions are 2.4% iii. And Income Tax deductions
What is the area of a rectangle with 5cm height and 77cm length?