Seudónimo Seudónimo
  • 17-01-2018
  • Mathematics
contestada

Number 9 need help!!!

Number 9 need help class=

Respuesta :

Eyesack
Eyesack Eyesack
  • 17-01-2018
So if the driveway is 45 feet long and he clears 6 feet per hour, we can divide 45 by 6 to find out how many hours it will take for him to clear the driveway and that is essential

45 / 6 = 7.5
45 feet / 6 feet per hour = 7.5 hours to clear the driveway
So now we know that the graph will end when he clears the driveway
If we know he will finish after 7.5 hours then find the graph that ends at the 7.5 hour mark,  and that is the last one

Answer Link

Otras preguntas

what the scientific name of frog​
Given that g(4)=9 and g(-11)=k, find the value of k that would result in a slope of 5 between the two points.
Pedro is 24 years old, and his sister is 2/3 his age. determine his sister age All fractions must be simplified. helpp plz
The quotient of 10 and a number​
Mrs. Schneider has Original Medicare Parts A and B and has just qualified for her state’s Medicaid program, so the state is now paying her Part B premium and sh
Three Bells toll at regular interval of 15 minutes 16 minutes and 36 minutes respectively given that they toll together at at 2 o'clock p.M. At what time will t
What is the factors of 5.1x
Describ a real world situation where oppisite quantities equal zero
1. Describe what it means for a field of study to be considered a science.
which is biggest River in Europe​