A negative cost variance combined with a negative schedule variance is an indicator of

Respuesta :

Kalahira
Kalahira Kalahira
  • 27-11-2017
Cost variance and schedule variance are indicators of efficiency of a project. Therefore if you have a negative cost variance and a negative schedule variance, then the project is inefficient and you should look into ways to cut costs and save money.
Answer Link

Otras preguntas

Which of the following equations is the result of cross multiplying the given proportion? (3)/(k+3)=(8)/(k-2) 3k - 2 = 8k + 3 3k - 6 = 8k + 11 3k - 6 = 8k + 24
PLZZ ANSWER FIRST TO ANSWER WILL GET BRAINLIST which set of integers is not a Pythagorean triple a)2,3,6 b)3,4,5 c)4,5,9 d)5,7,12 62 POINTTTTSSSSSSSS
What does excruciating mean
Consider the rectangular prism with length 3 cm, width 4 cm, and height of 6 cm. Will doubling one of the dimensions of the rectangular prism double the surfa
solve the compound inequality. graph the solution set. 4x-4>-4 and -3x+2<11​
Describe the results of three experiments that helped to show DNA is the genetic material
Convert negative 25° F to Celsius
Simplify the expression: (x + 3)(2x - 1) A) 7x2 - 3 B) 2x2 - 7x - 3 C) 2x2 - 5x - 3 D) 2x2 + 5x - 3
Please help I'm just horrible on this math and I don't get it at all. Which is a simplified form of the expression 3(m + 1) + 2m? A. m + 3 B. 5m + 1 C. 3m +
Sofia aprende que en chile