The term ______ describes a product produced as part of a project.
a. deliverable
b. scope
c. variance
d. work package

Respuesta :

W0lf93
W0lf93 W0lf93
  • 25-11-2017
A. Deliverable. Scope describes the parameters of the project, variance describes the deviation one can expect in price from the quoted work, and a work package is a subdivision of the final delivarable.
Answer Link

Otras preguntas

Which environmental hazard is the most serious in japan?
What kind of speech would you give at a meeting of your school newspaper to go over next month’s budget?
Which statement about Zapotec woodcarvings from the Oaxaca Valley, Mexico is true? A. They are an example of folk art. B. They depict real animals, not imagina
A DNA sequence is shown. AAT - CCG - GTG Which sequence best shows the result of a substitution mutation in the DNA? AAT - CCG - GTG AAT - CCA - GTG ACA - TCC
Describe the relation of India with outside world in ancient times
Convert 462grams to miligrams
Which lines are parallel and why? (Based off the markings)
In a kitchen there are three containers that can hold different quantities of water, as shown in the figure below. How many liters of water can the three cont
Please join these sentences using adjective cluase pronoun (who or whom) as appropriate.1. The nurse was friendly. He took care of my brother very well.2. The c
Bart and Sam played a game in which each player earns or loses points in each turn. a player total score after two turns is the sum of his points earned or los