ewaschenbeckeroy3cdx ewaschenbeckeroy3cdx
  • 20-10-2017
  • Business
contestada

True or false slab at grade foundations require water supply and wastewater piping to be installed before concrete is placed.

Respuesta :

sopie1 sopie1
  • 20-10-2017
false slab grade foundations tend to be instslled using a non govermental orgization whih also doesnt make it necessary to require water suppply and wastewater piping to be installed before concrete is placed.
Answer Link
adrian2477
adrian2477 adrian2477
  • 20-10-2017
False it is not true because it is false
Answer Link

Otras preguntas

What argument did Andrew Jackson use to persuade people that the Indian Removal Act was a good decision?
What is an equation of the line that passes through the points (5, 0) and (-5, -8)
How has Washington met the water needs of its residents, businesses, and farms? It built desalination plants to convert salt water into fresh water. It importe
A tank at is filled with of sulfur tetrafluoride gas and of sulfur hexafluoride gas. You can assume both gases behave as ideal gases under these conditions. Cal
please help :) I hope that I can get helped
An country's economic system refers to A. Whether it is led by president or a prime ministerB. The way in which it produces and distributes goods and services C
'Conflict is not only destructive but also constructive ' Justify this statement.​
HELP! i need answers for this quiz
Multiply the following polynomials. (3x²- 5x + 2)(7x + 1) A. 21x³- 35x²+ 14x + 1 B. 21x³+ 38x²+ 19x + 2 C. 21x³+ 3x²+ 14x + 2 D. 21x³- 32x²+ 9x + 2
express 1 by 5 as the percentage of 20 by 11​