panda954
panda954 panda954
  • 17-04-2017
  • Mathematics
contestada

A team of 15 workers can do a job in 7 hours. How long would this work take if the team has 35 people?

Respuesta :

taskmasters
taskmasters taskmasters
  • 28-04-2017
We would expect that the answer is a small value since there will be a total of 35 people who will work.
7 hours/15=x/35 workers
(7*15)/35=x hours
3hours=x


Therefore, the 35 people will work only for 3 hours. 
Answer Link

Otras preguntas

_____ is the irregular break of a mineral
Two states are in constant conflict with one another. Which type of boundaries are these states MOST likely to have? (1 point) I. Geometric boundaries II. Reli
Factor Xsquared +12x+27
The half-life of a certain substance is 20 years. How much of a 100 gram sample will be left after 20 years?
The length and width of a rectangle are consecutive even integers. The area of the rectangle is 80 square units. What are the length and width of the rectangle?
impact of abolition of slavery ?​
how does sea floor spreading relate to super continents
Please answer right away
How do you eat mathematical trees?
How can I learn divided by