A computer software firm was encountering difficulties in forecasting the programmer requirements for large-scale programming projects.

Respuesta :

taskmasters
taskmasters taskmasters
  • 29-03-2017
A computer software firm was encountering difficulties in forecasting the programmer requirements for a large-scale programming project maybe because of the following reasons:
1. Lack of data.
2. Unrealistic schedule.
3. Budget constraints.
4. Clashes of ideas.
5. Failed to adjust for growth requirements.
Answer Link

Otras preguntas

state and explain how osmosis is an essential process in our day to day life
What is true about the expiration dates of medications?
what is the answer !​
A water park charges $5 for entry into the park and an additional $2 for each of the big water slides. Steven spent $17 on his visit to the water park. Which eq
The formula for the predetermined overhead rate is estimated annual overhead costs divided by an expected annual operating activity. a. true b. false
the members of group IA are called alkali metals. give reason 2 marks​
Find the equation of the line in slope intercept form that has a slope of -2 and passes through the point (6,3). Demonstrate that your answer is correct (y=-2x+
The mass of the part of a metal rod that lies between its left end and a point x meters to the right is 3x^2 kg. Find the linear density when is 1 m, Where is t
Write the given number in the form a × 10 n , where a is a real number such that 1 ≤ |a| < 10 and n is an integer. 230,000,000,000 = 2.3 × 100,000,000,000 =
how long did the cuban missile crisis last in 1962