epiccool72
epiccool72 epiccool72
  • 17-08-2022
  • Mathematics
contestada

Airflow lifts a 3.6 kg bird 50 m up. How much work was done by the flow

Respuesta :

masojeanthony379
masojeanthony379 masojeanthony379
  • 17-08-2022

Answer:1800J or 1.8kJ

Step-by-step explanation:

work done= force× distance

force= mass× acceleration

g=10m/[tex]s^{2}[/tex]

3.6×10=36N

work done= 36×50=1800J or 1.8kJ

Answer Link

Otras preguntas

As the Civil War progressed badly for the North, what are three things that plagued Lincoln?
During which phase of mitosis do the sister chromatids first separate
Why were some Greeks shocked by the lives of Spartan women?
What is 15/20 as a percent
The strategy of grouping organisms based on their evolutionary history is called
What role did nationalism play in the outbreak of World War I? A. Nationalism caused a reduction in trade. B. Nationalism caused countries to stop the al
a triangular sail has a base length of 2.5 meters. the area of the sail is 3.75 square meters. how tall is the sail?
The Chaldean civilization believed in power and built three walls around Babylon. True or False
A model boat is made to a scale of 1:20 inches. If the 1:20 model boat is 15 inches wide, how wide is the actual boat
what number is between 27 and 45