ahmerrabab83 ahmerrabab83
  • 19-02-2022
  • Mathematics
contestada

10 man construct a building in 40 days . how long will it take 20 man to do this work ?

Respuesta :

matthewhoweicecream
matthewhoweicecream matthewhoweicecream
  • 19-02-2022

Answer:

20 days

Step-by-step explanation:

Answer Link

Otras preguntas

Is a penny soluble in water
F=9\5c+32 expresses the relationship between celcius and fahrenheit. Slove for c
How were the Ostrogoths affected by settling in the Western Roman Empire?
A volleyball serve was in the air for 2.2 seconds before it landed untouched in the far corner of the  opponent’s court. What was the maximum height of the ser
Perimeter of a parallelogram is 72 meters. The width is 4 meter less than the height. Find the width and height of the parallelogram
what is the value of 4x+9 if x=3?
Many times 4 can go into a 100?
Everett made three fifths of the baskets he shot. suppose he shot 60 baskets. how many did he make?
what are 3 facts about the hydrosphere?
What types of jobs did slaves do in each colonial region: New England, Middle and the South?