Larissafernandes2008 Larissafernandes2008
  • 21-07-2021
  • Mathematics
contestada


A construction company needs to remove 18 tons of dirt from a construction site. They can remove 2/3 tons of dirt each hour. How long will take to remove the dirt? Write your answer in simplest form

Respuesta :

wegnerkolmp2741o
wegnerkolmp2741o wegnerkolmp2741o
  • 21-07-2021

Answer:

27 hours

Step-by-step explanation:

Take the amount of dirt and divide by the amount per hour

18 tons ÷ 2/3 ton per hour

Copy dot flip

18 * 3/2

Rewriting

18/2 * 3/1

9*3 = 27

27 hours

Answer Link

Otras preguntas

Calculate the force of attraction between a K⁺ and an O₂⁻ ion the centers of which are seperared by a distance of 1.5 nm.
In Respiratory Alkalosis, we would expect to find ______ in a patient. a) overventilation, especially inspiration b) over-abundance of CO2 in the blood c) o
A new law in the State of Western precludes any judicial, legislative, or executive action designed to protect persons from discrimination based on their "trans
Is BK a median, an altitude, or neither?
Once nutrients have been acquired and broken down, they must be distributed throughout our bodies. What organ system is responsible for this task? 1) respirator
What is the right way to write the clap and rest for choral music?
Which of these refers to a message sent electronically?a. Bloggingb. Cookiesc. E-maild. Post
What two things can greatly impact a place's weather?
Explain the three-way trade system that developed after the British Empire took over India.
would like some assistance with this thank you