suyanka14 suyanka14
  • 16-07-2021
  • Physics
contestada

how to find work done by load

Respuesta :

Аноним Аноним
  • 16-07-2021
Calculation involving work done
Example
work done = force × distance.
work done = 1,000 N × 5 m.
work done = 5,000 J (or 5 kJ)
Answer Link

Otras preguntas

why do we have so many wars in the US​
When I talk about experience now, I'm have mixed emotions. On the One hand, I am nervous of how simple life was before The accident. But on the other, I've grow
If a basic life insurance illustration is used by an insurance producer in the sale of life insurance and the policy is applied for as illustrated, a signed cop
There are three kids. The sum of individual squares of their body weights (2 + 2 + 2) is 100. The sum of the product of their weights taking two friends at a ti
Extra points if correct! Thanks-Aparri
An object of mass 10.0 KG and volume 1000 ML and density 10 G/ML sinks in water who’s density is 1.0 G/ML. What is the mass of the water which has been displace
from where does the solar winds generate​
which shows the correct values for Esther’s seventh-grade classmates who have pets ?
questions related to Metals​
If (-4,32) and (7,-45) are two anchor points on the trend line, then find the equation of the line.