prashant123 prashant123
  • 17-04-2021
  • Mathematics
contestada

IF 30 Men Car do a piece of Work in 30 days the
in how many days 10 men can complete the Same work​

Respuesta :

Аноним Аноним
  • 17-04-2021

Answer:

let, the days for 10 men be x

  • 30/10=x/30
  • 900=10x
  • x=900/10
  • x=90

so 10 men can complete the same work in 90days.

Hope it helps.

Answer Link
Shanedm
Shanedm Shanedm
  • 17-04-2021
10 days because 30 men = 30 days, so in that logic 10 days = 10 men
Answer Link

Otras preguntas

What Is The Slope Of A Line parallel to y = -2/5x + 4/5
given f(t)=t to the power of 4 +t² -5, find the value of f(b) - f(-b)
Anne is 2 years older than betty.Last year ann was 2 times as old as betty.How old is ann?
what's the square root of 9
in what ways was Henry IV a good king of France?
If x = 30 degree, then which expression is equivalent to 1/2? a. -sin x b. sin x c. -cot x d. cot x
How did airplanes come to be?
How many ways can the letters of the word ORGANISM be arranged so the third letter is G?
Is it possible to construct a triangle with side lengths of 6 cm, 11 cm, and 13 cm?
INSERT TWO RATIONAL NUMBERS BETWEEN 2 AND 3. How to find them?