Answer:
$27,541
Explanation:
Calculation to Determine the activity cost
Activity Cost
Set-up $75.00
Movement:
Batch 60V $66
(Three batch moves *22.00 per batch)
Weight $750
(150 pounds*0.10 per pound*50)
Inspection $200
(Two sets of inspections*50*2.00 per unit)
Drilling $750
(3.00 per hole*five holes in each unit*50)
Welding $24,000
(6.00 per inch*80*50)
Shaping $800
(32.00 per hour*(30 minutes/60)*50)
Assembly $900
(18.00 per hour*1*50)
Total $27,541
Therefore the activity cost is $27,541