Tayloxosupnerodine
Tayloxosupnerodine Tayloxosupnerodine
  • 17-10-2016
  • Business
contestada

The type of budget that is prepared for the expected capacity level only is called a _______. static budget. flexible budget. continuous budget. master budget.

Respuesta :

Erudite1
Erudite1 Erudite1
  • 28-10-2016
The budget that is prepared for the expected capacity level only is called a fixed or static budget.
Answer Link

Otras preguntas

PLEASE HELP ME. I NEED LOTS​
what is the central idea of the text “the roaring twenties” by mike kubic (answer choices provided)?
A polynomial factor has a root of -3 with multiplicity 2, a root of 0 with multiplicity 1, a root with of 1 with multiplicity 1, and a root of 3 with multiplici
why do you think Jess hasn't cried yet about Leslie's death in bridge to terabithia​
Need help for number 24a
Right along with her and _____ to the party. Which pronoun best completes the sentence? A.) he B.) they C.) we D.) us
A 8.75-kg block is sent up a ramp inclined at an angle θ = 30.5° from the horizontal. It is given an initial velocity v0 = 15.0 m/s up the ramp. Between the blo
Any police officer appointed by law is required to conduct his duties with
how many principles are in the challenges of government
A bicyclist rides 1.86 km due east, while the resistive force from the air has a magnitude of 5.12 N and points due west. The rider then turns around and rides