10 workers build a wall in 4 days. how many workers are needed to build 4 such walls in 5 days

Respuesta :

Z0DD1X
Z0DD1X Z0DD1X
  • 19-10-2020

Answer:

wokers lot

Step-by-step explanation:

Answer Link

Otras preguntas

I need help what’s 6.4 divided by 1.6
What kind of rna is made when transcription occurs?
The function below takes a single string parameter: phone_number. Phone numbers will be passed in using the format '(555)867-5309'. Complete the function to ret
The diagram below represents a series of rock layers. Each different type of shape shown in the layers represents a fossil of a different species. For example,
(5,-2 is on which quardrant
Which graph decreases, crosses the y-axis at (0,-7), and then remains constant?
The difference between electronic and electrical devices is in the way they use electric current. Please select the best answer from the choices provided T or F
Grant is buying a pack of socks. 4 of the the pairs are black and 2 of the pairs are grey. What fraction is equivalent to the portion of socks that are NOT grey
A cylindrical rod of uniform density is located with its center at the origin, and its axis along the axis. Its radius is 0.03 m, its length is 0.7 m, and its m
which equation represents a line parallel to 3x-8y=12 A. y=3/8x-4B. y=-3/8x-4 C. y=8/3x-4D. y=-8/3x-4​