nickpowell0807 nickpowell0807
  • 16-10-2020
  • Computers and Technology
contestada

How does a project manager evaluate the scope of a project?

Respuesta :

ivymcfadden11 ivymcfadden11
  • 17-10-2020
Project scope is the part of project planning that involves determining and documenting a list of specific project goals, deliverables, features, functions, tasks, deadlines, and ultimately costs. In other words, it is what needs to be achieved and the work that must be done to deliver a project
Answer Link

Otras preguntas

The map shows the language patterns on the continent of Africa. Which languages are common along the northern coast of Africa? A. Indo-European B. Austrones
What are some scientists that discover planets ?
2.3 + r = 7.1 solve for r
PLEASE HELP!! Which method would be used to best prove the two triangles are similar? (Reminder, arrows represent parallel lines.) A. AA Similarity Theorem B.
The scale for a drawing is 1 centimeter to 5 meters. If the actual object is 35 meters, the drawing is _____ centimeters long. 30 175 7 40
I need help on this question and this is kinda hard for me
Find the surface area of this triangular prism . Be sure to include the correct unit in your answer
5. Cameron found the volume of the cone below, but when he double- checked his work, he got a different solution. Determine which solution best represents the
Solve the quadratic equation: x^2+4x+17=8-2x
A heat pump is to be used for heating a house in winter. The house is to be maintained at 70°F at all times. When the temperature outdoors drops to 40°F, the he