melissaw40 melissaw40
  • 18-09-2016
  • English
contestada

what is the subject and verb the project manager looked at the blueprints before visiting the job site

Respuesta :

galoctopus
galoctopus galoctopus
  • 18-09-2016
subject: project manager
verb: looked
Answer Link

Otras preguntas

A transverse wave is traveling on a string stretched along the horizontal x-axis. The equation for the vertical displacement y of the string is given by y = (1.
What is the probability of drawing three queens from a standard deck of cards, given that the first card drawn was a queen? Assume that the cards are not replac
The sum of two numbers is 86, and their difference is 20. Find the two numbers
What is one benefit of a nonrenewable resource, such as natural gas? A. Generate large amounts of electricity B. Less expensive overtime C. Produces pollution D
Question 4 of 102 PointsJuliana had $96, which is eight times as much money as Al had. How mucmoney did Al have? Select the correct solution method below, repre
What’s resistance in an electrical circuit ?
Calculate the enthalpy of the following reaction: 4 B (s) + 3 O2 (g) → 2 B2O3 (s) given the following pertinent information: (A) B2O3 (s) + 3 H2O (g) → 3 O2 (g)
Participe passe a) remplace les avec un pronom objet direct 1. j'ai choisi les livres (les livres) 2. nous avons vu la maison (la maison) 3. elle a ecrit ce tes
What is the difference between a joint and a fault? a)A joint is formed by confining pressure. b)A joint is formed by differential stress but a fault is not. c)
Anybody tryna smash?