Kiara12004
Kiara12004 Kiara12004
  • 19-07-2020
  • Mathematics
contestada


12. If it takes 6 men 4 days to dig a hole 3 metres deep, how long will it take
10 men to dig a hole 7 metres deep?

Respuesta :

umaima2005 umaima2005
  • 19-07-2020

Answer:

2 days

because if it takes 6 men to dig a hole in 4 days which is 3 metres long it will take 2days for 10 men to dig a hole which is 7 metres long

Answer Link
jasminreveles000 jasminreveles000
  • 25-02-2021

Answer:

8 days

Step-by-step explanation:

Answer Link

Otras preguntas

Help plz ASAP brainliest
WILL MARK BRAINLIEST IF CORRECT!! PLS ANSWER QUICKLY!!! Sleet forms from which type of precipitation? A. Snowflakes B. Ice crystals C. Rain droplets D. Freezing
Is "5 times as much" a small or large difference?
The Dybvig Corporation’s common stock has a beta of 1.5. If the risk-free rate is 4.6 percent and the expected return on the market is 12 percent, what is Dybvi
Calculate the volume of carbon dioxide at 20.0°C and 0.941 atm produced from the complete combustion of 4.00 kg of methane. Compare your result with the volume
Someone help me with this
The energy that generates wind comes from what source? A Magnetic attraction B Solar radiation C Electromagnetic waves D Severe thunderstorms
True or false sin x cos y=1/2(sin(x+y)+sin(x-y))
Ming has two job offers, in different states. The first job (a marketing manager) earns a salary of $51,000 and there is no state income tax. The second job (a
Draw the form of l-tryptophan which is present at biological ph.