lowkeystrugglingxoxo
lowkeystrugglingxoxo lowkeystrugglingxoxo
  • 19-05-2020
  • Physics
contestada

50W of power is generated using 100J of work to move a box onto a shelf. How long did it take to move the box from the floor to the shelf?

Respuesta :

temdan2001
temdan2001 temdan2001
  • 24-05-2020

Answer: time t = 2 seconds

Explanation:

Given that

Power P = 50W

Energy E = 100J

How long did it take to move the box from the floor to the shelf ? This implies time taken.

Power is defined as the rate at which work is done. I.e

P = W.D/t

Where work done = energy

50 = 100/t

Make t the subject of formula

t = 100/50

t = 2 second

Answer Link

Otras preguntas

Given f(x)=3x+12, find f(f^-1(0))
Need help with this maths question.
2 of 3 1. You go to another forest and measure the shadow of a tree to be 6 meters long. The shadow of your meter stick is 2 meters long. How tall is the tree?
Plz look at pic !!!! Plz respond!!!!
23,793,611 around to the nearest ten thousands​
Does the Babylonian law code address the problems and issues as our modern legal system?
what is one of the considerations to make when determining drug doses​
What is the term for the fire protection method in which townspeople formed two lines to pass containers filled with water toward the fire and empty containers
Could you please answer these questions it would help a lot 1.b-10=13 2.n-18=-10 3. 3=X/16 4. 14n=42
What is the answer please