idalia42 idalia42
  • 16-05-2020
  • Business
contestada


A______is a breakdown of a project into its various component parts with the
activities that must be performed for each component.

Work Breakdown Structure

Critical Path

Peak Performance Model

Scheduling Process

Respuesta :

aurive9
aurive9 aurive9
  • 16-05-2020

Answer:

work breakdown structure

Answer Link

Otras preguntas

A circle k(O) with radius 4.5 cm is given. Through point A (OA=9 cm) draw two tangents to the circle. What is the measure of the angle between the tangents?
An object has a mass of 8.5g and volume of 17ml what is the density of the object
Which of the following graphs has a constant rate of change?​
Why is 1861 significant to Texas
what has the same meaning as Eres paciente​
Hey, if anyone’s good at genetics, I was wondering if I was correct with this question on my homework.
Free-floating electrons, ductile, malleable, and good conductivity all describe * Metallic Bonds and Metallic Properties Ionic Bonds and Ionic Properties Nonme
What does NA means in chemistry form
According to the wechsler adult intelligence scale (wais), items requiring people to look at a visual stimulus with an essential part missing and identify the a
why Lack of gravity might cause muscles to weaken