paytongoodpg paytongoodpg
  • 17-03-2020
  • Mathematics
contestada

An automobile factory,1849 parts are made in 4 hours.what is the average rate at which parts are made per hour?

Respuesta :

igoroleshko156
igoroleshko156 igoroleshko156
  • 17-03-2020

Answer:

There are 462.25 parts being made per hour

Step-by-step explanation:

Step 1:  Make an equation

An automobile factory, 1849 parts are made in 4 hours.

1849 / 4 = x

Step 2:  Solve

1849 / 4 = x

462.25 = x

Answer:  There are 462.25 parts being made per hour

Answer Link
Wolfyy
Wolfyy Wolfyy
  • 17-03-2020

To find the hourly rate the parts are made, just divide.

1,849 / 4 = 462.25 parts made per hour.

Best of Luck!

Answer Link

Otras preguntas

Lucky Cow Dairy provided the following expense information for May:Assembly line workers' wages: $72,300Caps for milk bottles: 3,800Reconfiguring the assembly l
An equation is shown. 2x2 - x - 6 = 0 What is one solution to the equation?
what is the value of the variable -4=-5y+8-y​
What did some prominent African Americans do in response to racial discrimination during the Cold War? O A. Joined the Communist Party O B. Joined the armed for
Newhard Company assigns overhead cost to jobs on the basis of 116% of direct labor cost. The job cost sheet for Job 313 includes $20,504 in direct materials cos
select the graph of the equation below. y= -1/4x^2+1
How did the two hemispheres begin to interact?
can i pls get help this question is worth 40 points
Mae's allowance is ₱60. She saves 5% of it. What is the savings​
how to separate a mixture of iron filling and water