A road construction crew paves 1/5 mile every day. How much would they pave in 2 days?

Respuesta :

Ashrag253
Ashrag253 Ashrag253
  • 17-12-2018

Answer: 0.4 miles


Step-by-step explanation:

You can use the equation y=1/5x to help you figure it out where x is the days and y is the length. y=1/5(2). y=2/5 or 0.4 miles. Please vote my answer as brainliest

Answer Link

Otras preguntas

63 points thats all I got The Constitution that was written in 1787 is still in use today. However, it has been amended 27 times. These amendments have changed,
What is the the product of 15 and 5/12
9. How many lines of symmetry does the figure have? (1 point) Amico OOOO 6
What was one common goal among Allied leaders at the Potsdam Conference in 1945? to gain power and influence in the postwar world to redraw the boundaries of Ea
1- convert to standard categorical statement forms, and 2- abbreviate the statement 1- Kamala Harris is America’s first women Vice President. 2- Nobody will m
What are ecosystem services? Mention their different categories and also give twoexamples for each.​
In which of the following would competition not occur? A Rabbits grazing in a field B Owls and foxes hunting for mice с Daisies and dandelions growing in a lawn
f(x) = 4/9x + 7 linear or nonlinear?
answer choices:90ft square inches, 45ft square inches, 80ft square inches ​
cada unoEvalucion continúa 1.2.Encuentra el minimo comun multiplo mcm (a, b)de los siguientes pares (a,b).(7.5)(6.20)(2.9)(5.17)(22.4)(16.6)(6.22)(6,4)(5.2)(7.1