lilque4972 lilque4972
  • 18-05-2023
  • Computers and Technology
contestada

a 48- to 72-hour period during which a system or component is operated nonstop before installation at a user site is ____.

Respuesta :

Otras preguntas

There are a total of 126 people in a group. One person in seven has a cat for a pet. How many people do not have a cat?
on which two dates could all the locations on earth have equal hours of day and night?
The idea of "natural rights" means that
what dose a short caustic laugh mean?
what 2 things did sundiata do to improve mali
How are the Republican and Democratic presidential candidates chosen? They are nominated by their state governments. Each is nominated by his or her respective
A scale drawing of a building is one foot to 1/4 inch. What is the actual length of the building if the scale drawing shows that it is 13 1/2 inches long?
What is 6,739 divided by 6
what is the solution y=3x-13 2x+4y=4
What is 9/10 minus 2/5 equals? Steps I need to show.