A construction manager needs 12 workers to complete a building project in 54 days. If the building project needs to be completed in 36 days how many more workers does the construction manager need to complete the project

Respuesta :

Otras preguntas

Round 24,269 to the nearest thousand
The spread of the factory system resulted in all of the following EXCEPT: a. the movement away from home production. b. poorer quality of iron. c. the need for
if a storm windows has an area of 315 square inches, what are the dimensions if the window is 6 inches higher than it is wide (w x h)
which social scientists are best Known for studying the physical artifacts of a culture ?
what does it mean to be 'left in the dark'?
what does it mean to 'know your place'?
The length of a rectangle is 3 inches more than its width, and its perimeter is 22 inches. Find the width of the rectangle
Which of the the following could be the ratio between the lengths of the two legs of a 30-60-90?Check all that apply.
what are meristematic tissues?
You drop a ball from a height of 0.5 meter. Each curved path has 52% of the height of the previous path. a. Write a rule for the sequence using centimeters. The