fiorellanathalysaave fiorellanathalysaave
  • 20-10-2022
  • Mathematics
contestada

The employees at a baseball bat factory need to make 350,000 bats in 6 months. They make 2,750 bats each day and work 127 days in the 6 months. Do the employees make enough bats?

Respuesta :

Otras preguntas

please rewrite each fraction in at least two different ways a)11/2 b)3/8 c)10/7
Which of the following undergoes change during a chemical reaction? A. atomic masses of elements in reactants B. element identities of atoms in reactants C. tot
how does this quote apply to life “ Learn from yesterday, Live for today, Hope for tomorrow. The important thing is to not stop questioning” - Albert Einstein
The product of 718 and 82
Jan's Age is 3 years less than twice Tritts age. The sum of their ages is 30. Find their ages.
Which of these is the proper way to complete a cool down?
Line KL has an equation of a line y = 4x + 5. Which of the following could be an equation for a line that is perpendicular to line AB? (6 points) y = 4x − 8 y =
The executive agency that provides people with retirement income is?
17g+6=20g+3 Solve for the variable g.
Rebecca has a streptococcus bacterial infection. The back of her throat is inflamed on the left and right sides. What can the lymphatic system do to help Rebecc